View Categories

Error While Editing Scheduled Report in SIERA

< 1 min read

Table of Contents

Issue: #

While attempting to edit an existing scheduled report in SIERA, the system displays the error “Something went wrong”, preventing the schedule from being updated.

RCA: #

The error occurs when the End Date configured in the scheduled report exceeds the allowed limit of 1 year from the start date.

  1. During validation, updating the End Date to a date within 365 days (e.g., 30 January 2027) allowed the report to be saved successfully without errors.
  2. Although SIERA now allows selecting any future date in the UI, the underlying validation still restricts schedules to a 1-year maximum range, which triggers this error.
  3. Engineering has confirmed that the error message will be updated in future releases to reflect the exact cause.

Corrective Action: #

Update the End Date in the report schedule so that it falls within 1 year from the Start Date. Once corrected, the scheduled report can be saved successfully.



Scroll to Top